Vancouver BC

Barge Chillin’ – Vancouver BC

Project Details

Partial demolition of a beached barge

Clearview was asked to assist the general contractor with an excavator & shear to dismantle the stranded barge in English Bay.  Our machine had to be loaded from one barge onto the beached barge, where we took down the upper walls surrounding the perimeter of the deck and loaded the steel onto another barge for salvage. The general contractor completed the removal once we were clear.